Reorder level = average daily sales × lead time in days + safety stock. Safety stock is extra stock to cover busier days and late deliveries; a simple version is (maximum daily sales × maximum lead time) − (average daily sales × average lead time). When stock falls to the reorder level, order enough to bring it back up to a maximum level.

The terms

TermMeaning
Average daily salesUnits sold per day on average, over a recent period (for example the last 90 days).
Lead timeDays from placing an order to having the stock on the shelf.
Safety stockExtra units held to cover sales spikes and late deliveries.
Reorder level (reorder point)The stock level that triggers a new order.
Maximum levelThe most stock you want to hold, to limit cash tied up and expiry risk.
Order quantityMaximum level − current stock (rounded to the supplier's pack size).

The formulas

Safety stock = (maximum daily sales × maximum lead time) − (average daily sales × average lead time)

Reorder level = (average daily sales × average lead time) + safety stock

Maximum level = reorder level + (average daily sales × days between orders)

Worked example: a pharmacy

A pharmacy sells paracetamol 500 mg in boxes of 100 tablets.

InputValue
Average daily sales6 boxes
Busiest day sales10 boxes
Average lead time2 days
Longest lead time4 days
Orders placedWeekly (every 7 days)
  1. Safety stock(10 × 4) − (6 × 2) = 40 − 12 = 28 boxes
  2. Reorder level(6 × 2) + 28 = 40 boxes
  3. Maximum level40 + (6 × 7) = 82 boxes
  4. Order quantityIf stock is 38 boxes when you check: 82 − 38 = 44 boxes, rounded to the supplier's carton size.

Worked example: an agrovet before planting

An agrovet sells a hybrid maize seed in 2 kg packets. Outside the season it sells 2 packets a day; in the four weeks before planting, 25 a day. The supplier takes 5 days, up to 10 in peak season.

Off-seasonPlanting season
Average daily sales225
Maximum daily sales440
Lead time (avg / max)5 / 7 days5 / 10 days
Safety stock(4×7) − (2×5) = 18(40×10) − (25×5) = 275
Reorder level(2×5) + 18 = 28(25×5) + 275 = 400

The lesson: reorder levels must change with the season. Raise them a few weeks before demand rises and lower them as it falls, or you will run out at the peak and be stuck with seed afterwards. See seasonal stock planning.

Reorder levels and expiry

For products with short shelf lives, cap the maximum level so that the stock you hold will sell well before expiry: maximum level ≤ average daily sales × days of shelf life you can safely sell. Buying smaller quantities more often costs a little more in ordering effort but much less in expired stock.

A simpler rule if you have no data

  • Start with reorder level = 2 weeks of typical sales, maximum = 4 weeks.
  • Shorten for fast suppliers and short-dated products; lengthen for slow suppliers.
  • Review after a month using real sales data from your system.

Turning it into automatic reorders

In poso, each product (per location) can have a minimum and maximum. When stock falls below the minimum, the product appears on the reorder list and poso drafts purchase orders grouped by supplier, with quantities that bring stock back to the maximum. See purchasing and reorder rules.

Reorder level questions

What is the reorder level formula?

Reorder level = average daily sales × lead time (days) + safety stock.

How do I calculate safety stock?

A common simple method: (maximum daily sales × maximum lead time) − (average daily sales × average lead time).

What is the difference between reorder level and reorder quantity?

The reorder level is when to order; the reorder quantity is how much. A common approach orders enough to reach a maximum level.

How often should I review reorder levels?

Quarterly, and before and after seasonal peaks, or whenever a supplier's lead time changes.

What is the reorder point in a pharmacy?

The stock level of a medicine at which a new order should be placed, calculated from average sales, supplier lead time and safety stock.

Last updated by the poso team.